Live Experience: Feel the real performance of newest rides
Factory Visit: Explore our 200,000 m² modern manufacturing base
Register Now & Get Factory Discount Price →
How to produce unique amusement rides increase the customer flow of amusement parks? This is the goal that Beston® Rides and amusement park investors are concerned about.
As a top amusement rides manufacturer, we focus on producing high-yield, high-safety & high-attractive rides to help you build a popular amusement park. Here are some common amusement park equipment for reference:
Equipment Height:20-103m
Capacity: 72-268 persons
Reasons for Recommendation:
City icon & tourist attraction & suitable for large-scale projects.
Equipment Height:35m
Capacity: 16 persons
Reasons for Recommendation:
Thrilling free-fall sensation, visual landmark attraction & boosts visitor return rates.
Equipment Height:13.4m
Capacity: 16 persons
Reasons for Recommendation:
Extreme Appeal & Rapidly Boosts Traffic
Equipment Height:15.2m
Capacity: 16, 24, 32, 40 persons
Reasons for Recommendation:
Low investment, quick ROI & suitable for all ages.
Beston Rides is China’s leading amusement equipment manufacturer and amusement park project designer. We can provide 2D/3D park design planning. Here you can find the perfect solution for your park design.
Comprehensive outdoor amusement parks usually include large, medium, and kids amusement facilities, such as roller coasters, Ferris wheels, flying chairs, carousel rides, flying UFOs, big pendulums, bumper cars, self-control planes, tea cups, etc.
Our design team will plan the amusement park, recommend suitable rides, and provide you with various themes, colors and lighting. And determine the reasonable allocation of project investment based on the socio-economic conditions and market competition of the project.
Indoor amusement parks usually include a soft playground, trampoline equipment, VR, arcade games, basketball machines, etc.
For indoor playgrounds, we will recommend suitable themes and project catalogs for you to choose from, and then we will design based on your choice, floor CAD drawings, and requirements until you are satisfied.
Brief introduction: Water parks mainly include water slides, lazy rivers, swimming pools, wave pools, water houses, etc.
For the layout of the water park, our designers will fully consider site factors such as terrain, climate, and water sources, as well as site layout, safety, and environmental requirements to formulate a reasonable plan.
For amusement park solutions, we need to know: the land area, project location (Google Maps), CAD drawings, terrain conditions, geology, budget, and others required.
BESTON provides integrated amusement park project solutions to make your project profitable quickly.
Help customers analyze site location, surrounding environment, key competitors, etc.
Make a proper plan by comprehensively considering various factors such as site selection, park positioning, and surrounding merchants.
Committed to the R&D and manufacturing of entertainment facilities to ensure that entertainment facilities meet safety regulations, market demand, etc.
Local installation and after-sales service are provided by Indonesian overseas offices and local installation teams.
Cooperate with professional transportation companies to provide a variety of transportation options, including sea transportation, rail transportation, air transportation, etc.
Provide operational and investment guidance by considering project conditions, market analysis, etc. to ensure project success.
There are project cases in more than 100 countries including Indonesia, Malaysia, Saudi Arabia, Turkey, Russia, Uzbekistan, Kazakhstan, Nigeria, Algeria, Morocco, Jordan, Iraq, Saudi Arabia, Brazil and Chile. The completed and operated amusement facilities, projects and services have won wide praise from domestic and foreign customers!
Covering Area:3 hectares
Project Types: City Municipal Park
Recommended Rides:Swing tower, drop tower, rocket bungee, self-control plane rides, frog jump, carousel rides, pirate ship and so on.
Project Overview: Sky Park Baytik, a $13M private project, covers 4.5 hectares with 17 attractions: kids’ water park, trampolines, VR, and under-10 zone. Includes rest areas, restrooms, and food court. Beston supported its successful launch with on-site trial assistance.
Challenge: Mid-sized family park with aging rides needed thrilling attractions to revive declining.
Faced Problems: 1. Needed winter-proof, high-safety rides for cold-weather operation.
2. Local lack of experience in installing large rides.
3. Require EU CE approval & Russian GOST standards.
Solutions: 1. Provide roller coasters, pendulums, rotating towers and other equipment that can withstand -30℃ low temperatures.
2. Sent engineers for on-site installation support and staff training.
3. Complete dual certification with a third-party agency and provide a 10-year warranty on core components.
Coverage Area:3 hectares
Operation Time: 2024.2
Age Group: all ages
Investment Suggestion: Typical outdoor theme park for resorts
Recommended Rides:Flying chair / swing tower / phoenix rides / big pendulum / self-control plane ride / octopus ride / ferris wheel ride / flying UFO ride / pirate ship / disco tagada ride and so on
Type:50m ferris wheel
Project location: Cherepovets, Russia
Ages Group: all ages
Capacity: 32 cabins for 128 persons
Investment Advice: Landmark equipment attracts more customers locally to see the beautiful snow scenery
Project Operation:Opened on January 2, 2025, it has received 25,000 visitors as of January 13
Size: 50mL*47mW*8mH
Capacity: about 1600 children one time
Age: 0-18 years old
Investment suggestion: indoor park with a high utilization rate and strong playability
Recommended rides: Small ferris wheel / 16 seats carousel / soft playground / bumper car / children’s excavator / game machine / VR rides
Are you planning to build an amusement park project but worry about whether it will be profitable? You can contact Beston to help conduct an accurate return on investment analysis based on your amusement park situation. Here is the real investment budget analysis of XX amusement park project for your reference.
| Amusement Park Project Investment Budget Analysis Form | |||||
|---|---|---|---|---|---|
| Operating period | 8 (year) | Equipment life | 8~10 (year) | Electricity fee | 0.071 (USD/degree) |
| customer flow analysis | Working day | Off day | Average annual passenger flow | Effective day per year | Average fare |
| 300 (person/day) | 1000 (person/day) | 2000000 (person/year) | 300 (day) | 10 (USD/person) | |
| Equipment investment | Park Types | Equipment Qty | Full load power consumption | Max capacity | Average unit price |
| Outdoor Suburban Amusement Park | 12 (set) | 443.3 (degrees / hour) | 309 (person/ 5min)) | 71428 (USD/set) | |
| Total equipment investment (USD/year) | 857136÷8=107142 | ||||
| Site investment | Site area(㎡) | Venue rent (USD/year) | Public relations expenses (USD) | Caonstruction costs (USD) | Other cost |
| (USD/year) | |||||
| 80,000 | 71,428 | 14,285 | 42,857 | 14,285 | |
| Total site investment (USD/year) | 92,855 | ||||
| Operating cost | Operating electricity fee | Staff number | Per capita expenditure | Business activities | Tax expenses |
| 254 (USD/day) | 20 | 11.4 (USD/day) | 14285 (USD/year) | 7142 (USD/year) | |
| Total operating investment (USD/year) | 93,814 | ||||
| Operating income | Average annual net income | Annual average turnover | Average annual expenditure | ||
| 2,563,328 (USD) | 2,857,142 (USD) | 293,814 (USD) | |||
ISO 9001 certification ensures the consistency and reliability of our products through an international quality management system.
ISO 14001 certification affirms our ongoing commitment to environmentally friendly production.
BestonRides, holding EAC certification, offers its clients the supply and operation of amusement rides that are legal within EAEU countries:
Ensuring ride safety, assisting in obtaining the necessary documentation, and guaranteeing compliance with both international and local standards.
Beston Rides offers a full range of services, from design to operational support, helping customers quickly build successful amusement parks.
01
We develop the layout and selection of rides, taking into account the venue, routes, recreation areas, and food service areas, ensuring visitor comfort and flow.
02
International production standards and strict quality control at all stages, from raw materials to finished equipment.
03
On-site engineers oversee the delivery, installation, and setup of equipment, ensuring the successful completion of the project.
04
24/7 technical support and regular maintenance ensure the safe operation of rides.
05
Promotional materials and park management recommendations help increase visitor flow and project profitability.
A perfect standardized process makes you more worry-free and secure
Communication Online01
Initial Plan, Design Contract02
Site Survey03
Deepening Design04
Sign Contract05
Operational Guidance06
Production Rides,Transportation & Installation07
After-sales Service08
This website uses cookies.