Our Advantages
- Military Quality
Adopting hydraulic system imported from Germany, stable operation, failure rate less than 0.1%; triple electronic monitoring + emergency brake and other multiple protections.
- Unique Customized
The pendulum rides can be customized according to the requirements. The lighting can be customized, logo can be added, etc
- Global Service, Local Guarantee
Whether you are in the Middle East, Indonesia, Malaysia or Russia, we can provide you with integrated installation, training and maintenance services. 12-month warranty, 72-hour spare parts response, to ensure efficient operation of equipment, worry-free after-sales!
- Engineer Installation Guidance
Send two engineers to guide the installation on site (electrical engineer and mechanical engineer); with operation manual, after installation and commissioning, the installer will provide free
- Innovative Design, Technology-driven
Integrating cutting-edge design and technology, we optimize the pendulum’s structure and experience with advanced control systems and high-performance materials, boosting both performance and the park’s appeal and commercial value.
- Well-known Cooperation, Strength Witness
As a Disney partner and equipment supplier for more than 100 large amusement parks around the world, our large pendulum products have been widely used in the Middle East, Europe, Southeast Asia and other markets, with reliable quality and global trust.
Global Cases







Amusement Park Project In Sochi, Russia
Challenge: Mid-sized family park with aging rides needed thrilling attractions to revive declining.
Faced Problems: 1. Needed winter-proof, high-safety rides for cold-weather operation.
2. Require EU CE certification & Russian GOST standards.
Solutions: 1. Provide roller coasters, pendulums, rotating towers and other equipment that can withstand -30℃ low temperatures.
2. Complete dual certification with a third-party agency and provide a 10-year warranty on core components.
Pendulum Rides Video from Cooperation Clients
Amusement Park Project Solutions Provider






-
01Comprehensive Amusement Park Design
-
02Surburb Amusement Park Design
-
03City Amusement Park Project Design
-
04Indoor Amusement Park Design
-
05Resort Hotel Amusement Park Design
-
06Small City Square Park Design
High ROI Of Beston Amusement Park Project
Amusement Park Project Investment Budget Analysis Form | |||||
Operating period | 8 (year) | Equipment life | 8~10 (year) | Electricity fee | 0.071 (USD/degree) |
customer flow analysis | Working day | Off day | Average annual passenger flow | Effective day per year | Average fare |
300 (person/day) | 1000 (person/day) | 2000000 (person/year) | 300 (day) | 10 (USD/person) | |
Equipment investment | Park Types | Equipment Qty | Full load power consumption | Max capacity | Average unit price |
Outdoor Suburban Amusement Park | 12 (set) | 443.3 (degrees / hour) | 309 (person/ 5min)) | 71428 (USD/set) | |
Total equipment investment (USD/year) | 857136÷8=107142 | ||||
Site investment | Site area(㎡) | Venue rent (USD/year) | Public relations expenses (USD) | Caonstruction costs (USD) | Other cost |
(USD/year) | |||||
80,000 | 71,428 | 14,285 | 42,857 | 14,285 | |
Total site investment (USD/year) | 92,855 | ||||
Operating cost | Operating electricity fee | Staff number | Per capita expenditure | Business activities | Tax expenses |
254 (USD/day) | 20 | 11.4 (USD/day) | 14285 (USD/year) | 7142 (USD/year) | |
Total operating investment (USD/year) | 93,814 | ||||
Operating income | Average annual net income | Annual average turnover | Average annual expenditure | ||
2,563,328 (USD) | 2,857,142 (USD) | 293,814 (USD) |
Do you plan to build the amusement park project, but have no idea how to start? Please contact us country manager to tailor an investment & business plan for the whole park project.
Our Service
-
Pre-Sales Service
Learn more about customer needs and provide product configuration solutions
Invite customers to visit the production site or factory area and explain the whole process
According to customer needs, introduce necessary supporting plans or financing plans
For Park Project, supply 3D overall design and promotional animation of park
-
In-Sales Service
Provide customers with the production progress of the product in the workshop in time
According to customer needs, invite customers to the factory to verify before delivery
The whole process of monitoring the transportation links to ensure safety and timeliness,
contact the customer in advance to prepare the site and installation
-
After-Sale Service
Equipped with dedicated after-sales service engineers to maintain efficient communication
Continue to provide customers with professional training and cultivate follow-up professionals
Regularly inspect the customer site to learn the equipment status and solve all clients’ problems in time